Staff Spotlight:
I would like to take a moment to recognize a remarkable member of our team, Maurice Obyrne! Maurice consistently goes above and beyond for his team, even extending his three-day work week by picking up additional days when needed. He always brings an amazing attitude and leaves an everlasting positive impression on our residents. Thank you, Maurice, for all that you do. We truly appreciate you!
Main Entrance Door:
Our vendor Stanley arrived onsite yesterday to make the final repairs to the main entry. The front door is now operating as normal. Thank you for your patience as we worked with Stanley to complete the repairs.
Annual Fire Alarm Testing and Inspection:
Next week we are conducting out Annual Testing and Inspections of the buildings Fire Life Safety System. The inspection and testing will take place from
July 22nd – July 24th.
Please note this inspection does require unit access to complete the building inspection.
The schedule for each day of testing is shown below:
Monday, July 22nd:
8:00 am – 4:00 pm: General Common Area Testing – This testing is anticipated to be silent with minimal impact on residents in-house.
Tuesday, July 23rd:
8:00 am – 10:00 am: The Residential Elevators will be out of service for approximately 1 hour within this time frame to complete the mandatory testing.
We will update all Residents when this testing has commenced and again once completed. The Service elevator will be tested after the Residential cars have been completed.
10:00 am – 5:00 pm: Entry into each Unit within the Tower (Units 101 through GPH4) is required to complete visual and audible inspection.
Wednesday, July 24th:
10:00 am – 3:00 pm: Entry into all Row Homes Required to complete visual and audible inspection.
Thank you in advance for your cooperation. If you have any questions do not hesitate to reach out.
Penthouse Floor Window Replacement:
We wanted to inform you about an ongoing in-unit modification on the Penthouse floor, which will involve replacing a couple of windows next week. Moroso who are the contractors on this has informed us that this project will take the majority of the week.
To facilitate this work, there will be a spider crane set up on the Grand Penthouse patio floors, and another crane will be set up on the Webster Street side. Please be cautious as there will be quite a bit of activity outside.
This work should not directly affect anyone, but if for any reason it does, please contact a member of our team right away.